# MVP-TASK-019 — Advance Preparing to Ready

**Status:** Done  
**Parent:** MVP-KDS-002-S02; MVP-HIST-001-S02

## Objective and required behavior

Extend the fast forward operation from `Preparing` to `Ready` with persistence, timestamped history,
large target, and immediate feedback.

## Scope, areas, and non-goals

Reuse task 018 transition policy and presentation. No delivery, reverse path, or gesture redesign.

## Evidence and acceptance

Use both IDs in E2E/integration evidence. Accept when only a valid preparing order advances and the
history is appended exactly once per accepted operation, traceability is current, and inherited DoD
passes. Handoff notes any optimistic-update conflict behavior.
